VRM & Ball Mill Combined Grinding System

Home / Solutions / Greenfield Cement Grinding Plant / VRM & Ball Mill Combined Grinding System
VRM & ball mill combined cement grinding plant manufacturer

VRM & Ball mill combined cement grinding solution

Capacity: 700 ~ 5,000 TPD

Main Grinding Equipment: vertical roller mill, ball mill

Material: cement clinker

Working Process: cement combined grinding system

Solution: EPC service providing including design, procurement, construction, and trial operation

Free Inquiry

Solution Introduction

A cement clinker grinding unit comprises cement grinding mills and related equipment to grind cement clinker and get finished cement. As the name indicates, In the VRM & ball mill combined grinding system, the grinding mill is a vertical roller mill and a ball mill. Other equipment includes a combined separator, cement ball mill, and O-sepa separator.

Four mainstream grinding systems according to the cement mills using

Process of Cement clinker grinding plant with VRM & Ball mills

The VRM & ball mill combined grinding system is a closed circuit system. The vertical roller mill is adopted as a pre-grinding equipment with a separate ventilation system. The gas extracted from the ball mill is used as the primary air of the O-Sepa separator, and the secondary and tertiary air is ambient air.

VRM Pre-grinding

The vertical roller mill first pre-grinds the clinker and mixed materials.

Screening and Re-grinding

An inclined internal screening mechanism is installed in the mill following the pre-grinding of the clinker. The screening device stops the large pieces of material that escape and sends them back to the vertical mill for grinding and rolling.

Ball mill primary grinding

After smaller materials are screened, the fine powder is sent to the ball mill. There, it undergoes rolling and shearing, which reduces the material’s size and increases its number of cracks, 30% of which are smaller than 80um. The combined material produces ideal grinding conditions for the ball mill once it enters.

Classifying by O-sepa separator

The O-Sepa separator with downflow built into the top of the vertical mill uses powerful airflow to lessen the layer of powdery material on the grinding disc of the vertical mill.

Ball mill secondary grinding

After being selected for powder, the eligible materials go into the completed product warehouse, while the coarser materials go into the ball mill to be ground even more.

vrm & ball mill combined grinding system process

Features of the VRM & ball mill combined grinding system

The process is relatively complex, and the equipment investment is comparable to that of the fourth system, but the civil engineering cost is relatively less because the vertical mill can be arranged outdoors. In addition, the maintenance of the vertical mill is less than that of the roller press, so the operating rate is higher.

1) The clinker is pre-ground in the vertical mill. Following the pre-grinding, there are numerous cracks and the particles are sheared and rolled. The mixture produces ideal grinding conditions for the ball mill once it enters, significantly increasing the system’s grinding capacity.

2) The vertical mill uses both static and dynamic rings to guarantee the material layer’s thickness.

3) The ball mill’s output can be increased by simply selecting the sieve gap following the grinding efficiency parameters to ascertain the particle size entering the mill.

4) The classifying system is different from the screening of ordinary high-fine grinding. The primary distinction is that it falls under the category of dynamic active separation, has improved classification accuracy and efficiency, is easy to modify, and has no effect on the mill’s ventilation area.

5) The cement particle size distribution and particle morphology are more reasonable as a result of this combined grinding, which also solves important common technical issues with the reasonable matching of particle characteristics with surface energy, mechanical energy, and chemical energy. Its gelling efficiency is also greatly improved, and the chemical and mechanical energy activation of siliceous and siliceous aluminum industrial solid waste are combined organically.

Clinker grinding mills

Vertical Roller Mill

The vertical roller mill developed by SINOMA Zibo has the features of optimum design with a reliable structure. It integrates drying, grinding, classification, and transportation and can be completed in one piece of equipment. The TRM vertical roller mill series are widely applied in grinding cement raw meal, cement, coal, petroleum coke, desulfurized limestone, various metallurgical slag including steel slag, nickel slag, dry grinding of ceramic raw materials, machine-made sand, furnace slag, fly ash, iron ore, etc.

Advantages

Simple processes, drying, grinding, and classifying can be accomplished in one piece of equipment.

Compact layout and lower construction investment.

Higher grinding efficiency, lower power consumption, and lower wear ratio.

With high drying capacity, raw material with up to 20% moisture can be dried within the VRM grinding process.

Cement Ball Mill

Ball mills are widely used in cement, metallurgy, power generation, ceramics, and other industries. Ball mills have strong adaptability to a variety of raw materials, low failure rate, stable operation, and high reliability.

Features

Available drive methods include central drive, lateral drive, and complex drives.

Available bearing types are either sliding shoe bearings trunnions or a combination of both.

Discharge of the ball mils is at the end or in the middle of the ball mill.

Cement ball mill configuration

Specification (m)Grinding methodDrive typeGrinding chamber qtySpeed (p/min)Capacity(t/h)Bearing typeMain motor power (kw)
Φ3.2×13open circuitedge317.8950-52double slide shoes/main bearing1600/1800
Φ3.5×13open circuitcenter edge31770-80double slide shoes/main bearing2000
Φ3.8×13open circuitcenter2/316.3130 (roller press)double slide shoes/main bearing2500
Φ4.0×13open circuitcenter2/315.9575double slide shoes/main bearing2800
Φ4.2×13open circuitcenter2/315.690double slide shoes3550
Φ4.2×13.5open circuitcenter2/315.695double slide shoes3550
Φ4.2×14.5open circuitcenter2/315.3100double slide shoes3800/4000
Φ4.4×15open circuitcenter2/315.3110-115double slide shoes4000/4200
Φ4.6×14open circuitcenter2/31590double slide shoes4250
Φ5.0×15open circuitcenter2/314.4150double slide shoes5800/6000

For the configuration of the whole process, contact us!

Contact us

Contact us

SINOMA is committed to offering customers the most efficient plan for cement equipment, mining machinery, metallurgical equipment, environmental protection equipment, and engineering service.

+ 86 13683722138

info@sinoma-zb.com